Wendes Blog

Methods for Calculating Ductwork Labor

2019-11-05 8:29:09 Methods for calculating Ductwork Labor There are several methods to calculate ductwork labor cost however, we will cover three of the most commonly accepted methods that provide  consistent and accurate results are: The Hours per Piece Method, The The Hours Per Lb. Method and The Hours per Square Ft method for specialty ducts (PVC, FRP, Fiberglass, Flex etc.). The  Hours Per Piece method is based on the actual amount of labor that is required to fabricate or install each specific piece and type of ductwork,  predetermined and applied to the various sizes and types of ductwork in a takeoff. On this basis variations in  the size and type of each piece of ductwork fitting and duct are considered as part of the labor calculation formula. This method is based on labor studies for the various types and sizes of ductwork fabricated and the experience of the estimators knowledge of the sheet metal fabrication process and associated labor and installation. Production labor studies are most often used as the basis for determining labor cost. The important consideration with this method is that labor will vary, in some cases significantly with variations in ductwork type and size. The Pounds Per

Read More »

Basic Process for Calculating Piping Labor and Materials

2019-10-14 1:22:02 Calculating installation labor and material pricing for piping, fittings, valves and specialties is a function of several system type characteristics. As an example there are categories of material types; Black iron, copper, stainless steel, cast iron, plastic polybutylene, high density, polybutylene, brass. There are many other material types used but the most common plumbing material types are PVC, CPVC and PEX. Items are broken down based on either pipe or fitting type. Sizes ranges are most commonly from 1/2″ to 3″ diameter. Connection types are threaded, welded, flanged etc. Hanger types are band, ring, clevis, etc. The estimate should be broken down in labor and pricing tables, and on extension sheets based on material type, item type, sizes, connection type and hanger type. Hangers usually are not considered a fundamental category but should be listed separately. The takeoff may be broken down in categories so that correction multipliers may be applied based on project conditions. Project conditions may be applied based on standard floor plans, tight space, congested areas, elevated piping runs, equipment rooms, etc. with a breakdown based on different material types and system types; hot water heating, black steel, schedule 40 etc. and refrigeration system. Equipment

Read More »

Support

Contact

Blog

Privacy Policy

Copyright Notice

(847) 808-8371

saleshelp@wendes.com

1110 Lake Cook Road., Suite 374
Buffalo Grove, IL, 60089-1986