The Wendes Mechanical Estimating Manual provides an in depth guide to estimating fundamentals. One very important element of accurate detailed Duct estimating involves capturing the various types and concentration of fittings when calculating labor and material cost. Experienced estimators recognize the great swings in labor cost when considering the varied types of fitting in a duct run. As an example, a simple transition requires more assembly labor then a more complex transition offset and some types of elbows require significantly more labor than a simple square throat elbow. There are also significant swings in labor cost when there is a much higher concentration than average in the number of fittings in a duct system versus straight duct. It is extremely important to capture the swing in labor cost for not only the percentage of fittings versus straight duct but also the labor cost for each type of fitting in a duct system. This where the importance of “Pre Piece Labor Cost” should be calculated in order to achieve the most accurate and detailed labor cost in an estimate. In some cases under the pressure of producing an estimate quickly gross per pound costs are used or using the assumption that all fittings are created equal with respect to labor cost. Using per piece fitting calculations will always assure that you are capturing accurate labor costs in your takeoff. The Wendes Estimating Manual suggests using a work sheet to evaluate the various types of fittings in the duct system to help analyze not only the number of fittings in a duct system but the swings in labor cost for the various types of fittings in a ductwork system.
